Preem Refinery

At A Glance

Challenges

Refurbishment during TAR Programme of associated Vessel Refurbishments on-site.

Value to Client

Requirement for all technical support at site to be qualified to hold CCNSG / VCA Safety Passport as mandatory for access to client site.

blue alert sign

Objective

• Provision of on-site technical supervision, specialist welding, fitting and CSWIP Inspection support (10 x personnel).


• Provision of welding plant, tools, and equipment to undertake the works at site, provision of qualified and certified welding personnel to ISO 9606-1 Client standard and specifications.

• Vessel work-scope at site included refurbishment, replacement and re-instatement of new pipework, prefabricated spool-work.

Key Details

Project:
Preem Refinery
Location:
Gothenburg, Sweden
Date:
2023
blue tick

Solution

1

Replacement and re-instatement of vapour horn, vessel nozzles, valves and flanges, pipework and flanges, heat trace pipework, varying carbon pipework replacement, level gauge bridle replacement, various spool piece tie-in pipework.

2

All site welding activities inspected in line with Client NDE requirements at site. All works undertaken documented and controlled by APS CSWIP Welding Inspector with daily shift interface with Client NDE contractor and Client Inspection.

3

All personnel were required to undertake Preem Refinery site and safety inductions and to deliver the construction support safely to highest standards in quality throughout the 6 week programme.

Back to Case Studies

Click below to return to the case studies page
Case Studies Library
Aurora logo with white text

Entre em contato conosco

Se você quiser manter contato, preencha o formulário abaixo e responderemos à sua consulta (geralmente no próximo dia útil).

Obrigado! Seu envio foi recebido!
Opa! Algo deu errado ao enviar o formulário.