Objective
Attend the Moray East Offshore Wind Farm to carry out remedial repairs of marine grade coatings:
The primary work scope was to carry out touch up painting repairs on the damaged areas caused during lifting of the sub structures.
This included padeye recoating, grating repairs, handrail repairs according to pre-determined snagging list.