At a Glance

Challenges

Tank entry required technical specialised access which included lead climbing techniques.

Value to Client

The FPSO is back onsite and fully operational in Newfoundland Canada. 

As a result of the work performed by the Aurora Team further work opportunities have been awarded. 

blue alert sign

Objective

To carry out NDT inspections in the Cargo Oil Tanks (COT) and Water Ballast Tanks (WBT). 

To inspect lifting equipment and pressure vessels. 

blue tick

Solution

1

Aurora’s operations division team successfully mobilised a team of multi-skilled technicians to safely carry out this work. 

2

The team that carried out this scope of work consisted of six L3 Supervisor, six Level 1 and 2 operatives, all personnel were trained in confined space and lead climb through our internal training centre. 

3

Inspections from our competent body gives our client's peace of mind and allows them to focus entirely on other areas of their business.

Back to Case Studies

Click below to return to the case studies page
Case Studies Library

Let’s Power a Sustainable Future Together

Looking to optimise your energy assets? Our experts are here to help.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Solution

2

The team that carried out this scope of work consisted of six L3 Supervisor, six Level 1 and 2 operatives, all personnel were trained in confined space and lead climb through our internal training centre. 