Stronelairg Wind Farm

At a Glance

Challenges

Weather conditions, heavy snow delayed access to the site which resulted in reduced exposure times.

Value to Client

A competent team carried out a safe inspection with good collaborative communications.

blue alert sign

Objective

Inspect the met mast to ensure it is structurally sound and the ladder, fall arrest system safe for use.

Key Details

Project:
Statutory Inspection of 75m Met Mast
Location:
Scotland, UK
Date:
March 2024
blue tick

Solution

1

Aurora provided an experienced inspector and safety person to ensure the work was completed with zero harm.

2

A local inspector and safety person were appointed to minimise carbon consumption and reduce risk.

3

Back to Case Studies

Click below to return to the case studies page
Case Studies Library
Aurora logo with white text

Let’s Power a Sustainable Future Together

Looking to optimise your energy assets? Our experts are here to help.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.