At a Glance

Challenges

Weather conditions, heavy snow delayed access to the site which resulted in reduced exposure times.

Value to Client

A competent team carried out a safe inspection with good collaborative communications.

blue alert sign

Objective

Inspect the met mast to ensure it is structurally sound and the ladder, fall arrest system safe for use.

Key Details

Project:
Statutory Inspection of 75m Met Mast
Location:
Scotland, UK
Date:
March 2024
blue tick

Solution

1

Aurora provided an experienced inspector and safety person to ensure the work was completed with zero harm.

2

A local inspector and safety person were appointed to minimise carbon consumption and reduce risk.

3

Back to Case Studies

Click below to return to the case studies page
Case Studies Library
Aurora logo with white text

Entre em contato conosco

Se você quiser manter contato, preencha o formulário abaixo e responderemos à sua consulta (geralmente no próximo dia útil).

Obrigado! Seu envio foi recebido!
Opa! Algo deu errado ao enviar o formulário.